Open capacity before a queue peaks
Trigger operations when queue length, wait time or inflow rate predicts a service breach.

Measure entry rates, queue growth, directional movement and zone occupancy across checkpoints, gates and concourses.
Trigger operations when queue length, wait time or inflow rate predicts a service breach.
Compare movement between entrances, checkpoints, gates and transfer zones.
Use historical flow patterns for staffing, signage and facility planning.
Ayonix runs on the terminal's or station's existing cameras — standard RTSP and ONVIF streams — with processing that can stay inside the facility network. It follows bodies across the lines and zones you configure; it does not identify travellers.
Inflow by direction at the doors passengers arrive through, so a rising arrival rate shows before the queue it will become.
Queue length, queue growth and estimated wait per checkpoint, with thresholds that tell operations when to open capacity.
Live occupancy by zone where passengers wait, compared against the limits you configure.
Directional movement between zones — transfer corridors, escalators and station platforms — to find where flow actually slows.
One checkpoint, two weeks, agreed ground truth and a written scale recommendation.
No. Counting follows body movement across configured lines and zones; identity matching is not required, and counting does not switch it on. Identity checks at border control are a separate Ayonix system, with its own deployment and policies.
Yes. Processing can run at the edge or on premises, or in a hybrid design where video stays local and only approved aggregate data goes to reporting systems.
Counts, occupancy and threshold events are available through the API and webhooks, and as CSV exports, for operations dashboards, signage and staffing tools.
Often not. Ayonix accepts standard RTSP streams and can integrate with common VMS environments. Camera angle, resolution, frame rate and scene density are checked before the pilot.
At one checkpoint or gate for two weeks: a scene and camera review, site calibration, manual ground truth agreed in advance, and an acceptance report with a written recommendation before any network rollout.